Difference between revisions of "2012 Alternative Break Project"
From PhiSigmaPiWiki
(created page) |
(added links) |
||
Line 1: | Line 1: | ||
During the [[2011 National Convention]] it was announced that the 2012 Alternative Break Project would be taking place at two locations: | During the [[2011 National Convention]] it was announced that the 2012 Alternative Break Project would be taking place at two locations: | ||
* SPARK Academy in Newark, NJ to construct a mural that will make their new location more kid-friendly, as well as to reflect the values and mission of KIPP | * SPARK Academy in Newark, NJ to construct a mural that will make their new location more kid-friendly, as well as to reflect the values and mission of KIPP | ||
− | * KIPP Spirit College Preparatory in Houston, TX to build an outdoor | + | * KIPP Spirit College Preparatory in Houston, TX to build an outdoor theater/classroom where students can perform plays |
+ | ==Links== | ||
+ | * [http://phisigmapi.org/Default.aspx?tabid=5156 2012 Alternative Break Project] | ||
{{abp}} | {{abp}} | ||
[[category:Alternative Break Project]] | [[category:Alternative Break Project]] |
Revision as of 19:07, 10 August 2011
During the 2011 National Convention it was announced that the 2012 Alternative Break Project would be taking place at two locations:
- SPARK Academy in Newark, NJ to construct a mural that will make their new location more kid-friendly, as well as to reflect the values and mission of KIPP
- KIPP Spirit College Preparatory in Houston, TX to build an outdoor theater/classroom where students can perform plays